Chapter 7. Operating profitableness of the investment project. Dynamic indicator profitableness of project
Alexandr Zhevnyak
from Socionet
Abstract:
The general principle of constructing the operating profitableness of the investment project (OIRR) is proposed in the form of the ratio of the aggregate investor and the recipient of interest discounted income to their total discounted indebtedness calculated at each interval of the change in the discount rate between two neighboring IRR values. However, in the interval between the lowest and highest IRR value of the project, OIRR assumes values equal to the discount rate, which means that it does not have the property of NPV compatibility and cannot be used in practice. Alternatively of OIRR, the indicator DIRR (dynamic IRR) is offered as a sum of the discount rate and the ratio of NPV to the dynamic indebtedness of the project (it was also used in the OIRR denominator). The DIRR is constructed as a spline function from the fragments computed in each interval between neighboring IRR values. It is proved that DIRR is differentiable at a discount rate everywhere, except for points that coincide with IRR values of even multiplicity
References: Add references at CitEc
Citations:
Downloads: (external link)
https://socionet.ru/~yfexbkczcfv/files/Chapter7.pdf
Our link check indicates that this URL is bad, the error code is: 404 Not Found
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:nos:bedcdu:nc07
Access Statistics for this chapter
More chapters in NEW CONCEPT OF RETURN ON BORROWED AND INVESTMENT PROJECTS from Socionet
Bibliographic data for series maintained by Александр Жевняк ( this e-mail address is bad, please contact ).