Uncertainty
Steve Curry and
John Weiss
Additional contact information
Steve Curry: Asian Development Bank
John Weiss: University of Bradford
Chapter 9 in Project Analysis in Developing Countries, 2000, pp 225-237 from Palgrave Macmillan
Abstract:
Abstract The techniques of project analysis have been considered so far as if the basic data, which they use, is known with certainty. However, both technical and economic information is used in the form of forecasts, and is subject to considerable uncertainty. It is possible to conceive of different values, based on experience, for the fundamental technical relations in any productive process, and for the project costs and benefits at either financial or economic prices. For most project data, a range of values can be found or predicted, yielding the possibility of different conclusions in the application of project worth measures.
Keywords: Risk Analysis; Discount Rate; Unskilled Labour; Project Analysis; Resource Flow (search for similar items in EconPapers)
Date: 2000
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-0-230-37511-6_9
Ordering information: This item can be ordered from
http://www.palgrave.com/9780230375116
DOI: 10.1057/9780230375116_9
Access Statistics for this chapter
More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().