Adaptive intent
Sergio Pellegrinelli
Chapter Chapter 12 in Thinking and Acting as a Great Programme Manager, 2008, pp 146-157 from Palgrave Macmillan
Abstract:
Abstract Bobbie Mason, the manager of the Enterprise Systems Programme for Standard Utilities, faced a dilemma: bypass company procedures or accept significant slippage and the possibility of more problems later in the programme.
Keywords: Information System; Migration Work; Training Company; Steering Group; Procurement Process (search for similar items in EconPapers)
Date: 2008
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-0-230-58308-5_12
Ordering information: This item can be ordered from
http://www.palgrave.com/9780230583085
DOI: 10.1057/9780230583085_12
Access Statistics for this chapter
More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().