Measuring System Performance
Andrew M. McCosh,
Mawdudur Rahman and
Michael J. Earl
Chapter 11 in Developing Managerial Information Systems, 1981, pp 255-285 from Palgrave Macmillan
Abstract:
Abstract It is ironic that whilst many MIS exist to provide intelligence and feedback for planning and control, monitoring and measurement of the MIS themselves is frequently inadequate. System performance should be measured for three reasons: (1) to ascertain whether the MIS has met its stated objectives; (2) to ensure that the ongoing MIS operates reliably and efficiently; and (3) to ensure that the MIS adapts to change. Just as in the performance, tracking and diagnosis activities of the management control system model described in Chapter 9, three feedback loops are involved: (1) system corrections and modifications to meet stated objectives; (2) modification and extension of system objectives themselves to meet changed needs; and (3) the decision to replace or kill the system when it no longer can meet current needs, or no longer is required.
Keywords: Managerial Information System; Periodic Review; Measure System Performance; Management Control System; Product Review (search for similar items in EconPapers)
Date: 1981
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-1-349-03631-8_11
Ordering information: This item can be ordered from
http://www.palgrave.com/9781349036318
DOI: 10.1007/978-1-349-03631-8_11
Access Statistics for this chapter
More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().