Adaptive Cooperation: The High Tension Cable Co
John Purcell
Chapter 7 in Good Industrial Relations, 1981, pp 192-226 from Palgrave Macmillan
Abstract:
Abstract Telephone exchange switchgear has gone through major design changes in the last two decades from largely mechanical ‘step-by-step’ methods to fully electronic systems utilising micro-circuits. Between these two systems, as a transitional phase in switchgear design, electro-mechanical systems were developed and manufactured to Post Office specifications. This ‘crossbar’ system, involving extensive wiring assembly work often undertaken by women, began in the 1960s, reached a peak of demand in the early years of the 1970s, and rapidly declined with the heavy cuts in Post Office orders in the second half of the decade and a general move to electronic systems. This case history concerns the development of industrial relations in one of the two factories in the High Tension Cable Co.’s massive empire (an American multinational with a wholly owned UK subsidiary) where crossbar systems were manufactured. The plant, with around 500 manual workers, was based in the Lowlands of Scotland.
Keywords: General Manager; Payment System; Industrial Relation; Night Shift; Management Style (search for similar items in EconPapers)
Date: 1981
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-1-349-04503-7_7
Ordering information: This item can be ordered from
http://www.palgrave.com/9781349045037
DOI: 10.1007/978-1-349-04503-7_7
Access Statistics for this chapter
More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().