Freeman Fox & Partners: Severn Bridge Design
Luke Georghiou,
J. Stanley Metcalfe,
Michael Gibbons,
Tim Ray and
Janet Evans
Chapter 11 in Post-Innovation Performance, 1986, pp 164-170 from Palgrave Macmillan
Abstract:
Abstract The Severn Bridge, officially opened in 1966, linked the southern industrial part of Wales with England, providing a major saving in the time taken to travel between these areas. The design represented a significant departure from the Forth Bridge, which was built by largely the same team of engineers only two years before. After the war, plans were being prepared to build what had long been seen as the three major outstanding road bridges in Britain: the Firth of Forth, the Severn and the Humber. All had to be suspension bridges and priority was given to the first two, each of which had a main span of approximately 1000m. Initially it was thought the Severn Bridge would be built first. To this end the Ministry of Transport built a wind tunnel where the National Physical Laboratory carried out aerodynamic tests in collaboration with the two engineering firms responsible for the design, Freeman Fox & Partners and Mott, Hay & Anderson.
Keywords: Suspension Bridge; National Physical Laboratory; Main Cable; Main Span; Toll Revenue (search for similar items in EconPapers)
Date: 1986
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-1-349-07455-6_16
Ordering information: This item can be ordered from
http://www.palgrave.com/9781349074556
DOI: 10.1007/978-1-349-07455-6_16
Access Statistics for this chapter
More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().