The Commission at Work
Michael R. Bonavia
Chapter 6 in The Nationalisation of British Transport, 1987, pp 60-73 from Palgrave Macmillan
Abstract:
Abstract The total life-span of the BTC was to be only fifteen years; and even this relatively short period was to be divided into two phases — from 1948 to 1953, and from 1953 to 1962, with progress towards execution of the chief tasks for which the Commission had been created virtually confined to the first phase. Even within that short span, no more than four years could be devoted to the original ‘grand design’ of integrated transport, since the Conservative government which took office in October 1951 quickly made known its intention drastically to revise the provisions of the Transport Act, 1947; it thus imposed a virtual standstill upon all those activities of the BTC of which the Conservatives did not approve.
Keywords: Civil Servant; Road Transport; Rail Transport; Passenger Transport; Grand Design (search for similar items in EconPapers)
Date: 1987
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-1-349-08793-8_6
Ordering information: This item can be ordered from
http://www.palgrave.com/9781349087938
DOI: 10.1007/978-1-349-08793-8_6
Access Statistics for this chapter
More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().