EconPapers    
Economics at your fingertips  
 

Design Study for Key Components of Slurry TBM in Tunnel with High Pressure Water

Yuefeng Yin (), Ti Zhang and Kunpeng Chen
Additional contact information
Yuefeng Yin: China Railway Engineering Equipment Group Co., Ltd
Ti Zhang: Henan Economics & Management School
Kunpeng Chen: China Railway Engineering Equipment Group Co., Ltd

A chapter in Proceedings of the 2023 4th International Conference on Management Science and Engineering Management (ICMSEM 2023), 2024, pp 1122-1129 from Springer

Abstract: Abstract Taking an Italian tunnel project with high pressure water as an example, this paper analyses and researches the sslurry TBM’s key components such as cutterhead, main drive and thrust system for large overburden tunnel and high hydrostatic stratum by combining the probability analysis of geological data, and by this way derives its theoretical design basis, aiming to provide some theoretical basis on the tunnel projects and reference for the design of subsequent projects.

Keywords: Slurry TBM; Cutterhead; Main Drive; Thrust System; Over-excavation (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:advbcp:978-94-6463-256-9_112

Ordering information: This item can be ordered from
http://www.springer.com/9789464632569

DOI: 10.2991/978-94-6463-256-9_112

Access Statistics for this chapter

More chapters in Advances in Economics, Business and Management Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2026-06-17
Handle: RePEc:spr:advbcp:978-94-6463-256-9_112