The Fuzzy Time-Cost Tradeoff Problem
Hua Ke () and
Weimin Ma ()
Additional contact information
Hua Ke: Tongji University
Weimin Ma: Tongji University
Chapter Chapter 42 in Handbook on Project Management and Scheduling Vol. 2, 2015, pp 929-942 from Springer
Abstract:
Abstract The time-cost tradeoff problem is a specific type of the project scheduling problem, which studies how to modify project activities so as to achieve the tradeoff between the completion time and the project cost. In real projects, the tradeoff between the project cost and the completion time, and the uncertainty of the environment are both considerable aspects for managers. In this chapter, three new fuzzy time-cost tradeoff models are proposed, in which credibility theory is applied to describe the uncertainty of activity durations. A searching method by integrating fuzzy simulation and genetic algorithm is developed to search quasi-optimal schedules under some decision-making criteria. The purpose of this work is to reveal how to obtain the optimal balance of the completion time and the project cost in fuzzy environments.
Keywords: Credibility theory; Fuzzy sets; Project scheduling; Time-cost tradeoff (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:ihichp:978-3-319-05915-0_12
Ordering information: This item can be ordered from
http://www.springer.com/9783319059150
DOI: 10.1007/978-3-319-05915-0_12
Access Statistics for this chapter
More chapters in International Handbooks on Information Systems from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().