EconPapers    
Economics at your fingertips  
 

Multi-Criteria Multi-Modal Fuzzy Project Scheduling in Construction Industry

Jiuping Xu () and Ziqiang Zeng ()
Additional contact information
Jiuping Xu: Sichuan University
Ziqiang Zeng: Sichuan University

Chapter Chapter 59 in Handbook on Project Management and Scheduling Vol. 2, 2015, pp 1307-1335 from Springer

Abstract: Abstract The construction project managers often face the challenges to compromise among different conflicting aspects of a project, especially for the criteria of time, cost, quality, and environment in a multi-modal project. This leads to a multi-criteria multi-modal project scheduling decision making problem. The complexity in the project scheduling is concentrated on the search for an ideal level of balance among all the conflicting criteria. In fact, the tradeoff among these criteria is determined by the modal selection and the duration reduction applied within the selected mode in a multi-modal project. Therefore, it is important to improve the optimality and effectiveness of modal selection that significantly contributes to the success of a project. In this chapter, the introduction and statement of a discrete time-cost-environment tradeoff problem (DTCETP) for large-scale construction systems with multiple modes under fuzzy uncertainty are presented. The modelling process of DTCETP is explained in detail. Since the DTCETP belongs to the class of non-deterministic polynomial-time hard problems, a fuzzy-based adaptive-hybrid genetic algorithm is developed to efficiently find feasible solutions. Finally, the case study of Jinping-II Hydroelectric Project is employed as a practical application example.

Keywords: Construction industry; Fuzzy sets; Multi-criteria decision-making; Multi mode; Project scheduling (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:ihichp:978-3-319-05915-0_29

Ordering information: This item can be ordered from
http://www.springer.com/9783319059150

DOI: 10.1007/978-3-319-05915-0_29

Access Statistics for this chapter

More chapters in International Handbooks on Information Systems from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-23
Handle: RePEc:spr:ihichp:978-3-319-05915-0_29