The Stochastic Resource-Constrained Project Scheduling Problem
Maria Elena Bruni (),
Patrizia Beraldi () and
Francesca Guerriero ()
Additional contact information
Maria Elena Bruni: University of Calabria
Patrizia Beraldi: University of Calabria
Francesca Guerriero: University of Calabria
Chapter Chapter 37 in Handbook on Project Management and Scheduling Vol. 2, 2015, pp 811-835 from Springer
Abstract:
Abstract Resource-constrained project scheduling has been widely investigated in the academic literature, but the issue of the incorporation of uncertainty in project scheduling has received a growing research attention only in the last 15 years. This chapter gives an overview of models and methods for the resource-constrained project scheduling under uncertainty. The case of known deterministic renewable resource requirements and random activity durations with a known probability distribution function is studied in detail. In particular, we show how, through the use of joint probabilistic constraints, a feasible baseline schedule with minimum makespan can be built, which is able to tolerate a certain degree of uncertainty and to absorb dynamic variations in activity durations. The use of joint probabilistic constraints, within the stochastic scheduling problem, represents an innovative element in the literature and enables the relaxation of the common assumption that only one activity at a time disturbs the starting time of a successor activity, rather limiting the joint probability of disruption of the preceding activities to a given probability level. The results obtained with the proposed heuristics are discussed and compared with two well known heuristics taken from the literature on a set of randomly generated project instances. A practical application concerning a real project for construction of students’ apartments at the University of Calabria, Italy, is also illustrated. Based on the analysis of the various researches discussed in this chapter, avenues for future research will be also outlined.
Keywords: Chance constraints; Project scheduling; Random variables; Stochastic RCPSP; Stochastic scheduling (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (5)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:ihichp:978-3-319-05915-0_7
Ordering information: This item can be ordered from
http://www.springer.com/9783319059150
DOI: 10.1007/978-3-319-05915-0_7
Access Statistics for this chapter
More chapters in International Handbooks on Information Systems from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().