Less from More: China Built Wind Power, but Gained Little Electricity
Jonas Grafström
A chapter in Questioning the Entrepreneurial State, 2022, pp 219-231 from Springer
Abstract:
Abstract This chapter investigates Chinese wind power development and concludes that innovation cannot be pushed by the efforts of many, and that when the state clarifies directions and objectives, these can be achieved but with severe and unexpected side effects. Two topics are explored: wind curtailment and low technological development, both examples of unproductive entrepreneurship induced by government policies. The goal of wind power capacity expansion leads to construction (i.e., generation capacity) but little electricity. Examples of failures include low grid connectivity with, some years averaging 15% of generation capacity broken or unconnected to the grid. A key lesson for Europe is that forced innovation often amounts to little and that the old saying holds up: “no plan survives contact with reality.”
Keywords: Wind curtailment; Patents; Economic Planning; Entrepreneurship; Policy (search for similar items in EconPapers)
Date: 2022
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:inschp:978-3-030-94273-1_12
Ordering information: This item can be ordered from
http://www.springer.com/9783030942731
DOI: 10.1007/978-3-030-94273-1_12
Access Statistics for this chapter
More chapters in International Studies in Entrepreneurship from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().