Modelling Setup Times in Project Scheduling
Marek Mika,
Grzegorz Waligóra and
Jan Weglarz
Additional contact information
Marek Mika: Poznań University of Technology
Grzegorz Waligóra: Poznań University of Technology
Jan Weglarz: Poznań University of Technology
Chapter Chapter 6 in Perspectives in Modern Project Scheduling, 2006, pp 131-163 from Springer
Abstract:
Abstract In this chapter project scheduling problems with setup times are considered. Some practical applications justifying considering setups separately from activities are described. An extensive classification of setup times adapted from machine scheduling is proposed, including activity vs. class setup, separable vs. inseparable setup, as well as sequence-independent and sequence-dependent setup times. A new category of setup times - schedule-dependent ones - is discussed. The main part of the paper shows how to model setup times in the presence of particular project components, such as: precedence constraints, resource availability constraints, multiple resource units requests, multiple resources, etc. Some possible extensions of the presented models are given.
Keywords: project scheduling; setup; setup time; setup cost (search for similar items in EconPapers)
Date: 2006
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-0-387-33768-5_6
Ordering information: This item can be ordered from
http://www.springer.com/9780387337685
DOI: 10.1007/978-0-387-33768-5_6
Access Statistics for this chapter
More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().