Production Planning Under Uncertainty with Workload-Dependent Lead Times: Lagrangean Bounds and Heuristics

Gregory Dobson () and Uday S. Karmarkar
Additional contact information
Gregory Dobson: University of Rochester

Chapter Chapter 1 in Planning Production and Inventories in the Extended Enterprise, 2011, pp 1-14 from Springer

Abstract: Abstract Advances in modeling production system behavior over the past three decades have made it apparent that work-in-process (WIP) inventories, created by the dynamics of manufacturing systems, are an important characteristic of these systems. Furthermore, the recognition of the importance of lead times and the variability of lead times for system performance has lent additional emphasis to this behavior. Consequently, consideration of WIP and lead times has been a key aspect addressed in the analysis and development of various types of scheduling and job release systems, of which Kanban and workload-based methods are examples.

Keywords: Lead Time; Planning Model; Capacity Planning; Safety Stock; Clearing Function (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-1-4419-8191-2_1

Ordering information: This item can be ordered from
http://www.springer.com/9781441981912

DOI: 10.1007/978-1-4419-8191-2_1

Access Statistics for this chapter

More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:isochp:978-1-4419-8191-2_1