Price-Driven Hydropower Dispatch Under Uncertainty
Martin Densing
Chapter Chapter 4 in Handbook of Risk Management in Energy Production and Trading, 2013, pp 73-104 from Springer
Abstract:
Abstract After a review of hydropower optimization models, we focus on price-driven hydropower dispatch models under uncertainty of the electricity price. We present two modeling approaches for pumped-storage plants. In the first model, the water level is constrained in expectation. We discuss the marginal price of water, which is obtained analytically, and influences of price variances. The second model is a multistage stochastic linear program on a scenario tree. Financial risk is constrained by a time-consistent extension of CVaR (conditional-value-at-risk). The model has two time scales: The short-term dispatch decision is separated from the long-term planning by aggregating electricity prices into occupation times at price levels. The risk constraint is tested in a case study.
Keywords: Risk Measure; Electricity Price; Scenario Tree; Occupation Time; Reservoir Level (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations: View citations in EconPapers (1)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-1-4614-9035-7_4
Ordering information: This item can be ordered from
http://www.springer.com/9781461490357
DOI: 10.1007/978-1-4614-9035-7_4
Access Statistics for this chapter
More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().