A Risk Integrated Methodology for Project Planning Under Uncertainty
Willy Herroelen ()
Additional contact information
Willy Herroelen: KU Leuven
Chapter 9 in Essays in Production, Project Planning and Scheduling, 2014, pp 203-217 from Springer
Abstract:
Abstract In this chapter we describe a risk integrated methodology for tactical and operational project planning under uncertainty. The methodology integrates quantitative risk analysis with reliable proactive/reactive project scheduling procedures. The integrated methodology relies on an iterative two-phase process. In phase 1 we determine the number of regular renewable resource units to be allocated to the project and the so-called internal project due date. Phase 2 implements a proactive/reactive schedule generation methodology. The proactive schedule to be used as a guideline during actual project execution is itself generated using a two-step procedure. In the first step, a precedence and resource feasible project schedule is constructed with acceptable project makespan. In a second step, the schedule is protected against disruptions that may occur during the execution of the project through the insertion of resource and/or time buffers into the schedule. A sufficient number of schedule executions are then simulated using the quantitative risk analysis information about possible resource breakdowns and the variability of activity durations. When the schedule becomes infeasible, it may be repaired by (a) preempting one or more of the active activities and rescheduling activities that are planned in the future but are affected by the preemption through precedence relations or the use of shared resources, or (b) by hiring irregular renewable resource capacity at an additional irregular capacity cost. The mean-variance function of the schedule execution costs may then used to evaluate the chosen resource and internal due date decisions made in phase 1. The final proactive schedule can then be deployed as a baseline during actual project execution in combination with a workable reactive scheduling procedure to be invoked when, despite the built-in protection, the baseline schedule becomes infeasible.
Keywords: Project Schedule; Time Buffer; Baseline Schedule; Tabu Search Procedure; Project Execution (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-1-4614-9056-2_9
Ordering information: This item can be ordered from
http://www.springer.com/9781461490562
DOI: 10.1007/978-1-4614-9056-2_9
Access Statistics for this chapter
More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().