Hydropower with Constraints
Finn R. Førsund
Additional contact information
Finn R. Førsund: University of Oslo
Chapter Chapter 3 in Hydropower Economics, 2015, pp 35-72 from Springer
Abstract:
Abstract The analysis in Chapter 2 concluded that the price should be the same for all time periods. However, even a superficial knowledge of electricity markets with a significant presence of hydropower tells us that electricity prices vary over seasons and even days.
Keywords: Demand Curve; Shadow Price; Optimal Price; Reservoir Level; Shadow Prex (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-1-4899-7519-5_3
Ordering information: This item can be ordered from
http://www.springer.com/9781489975195
DOI: 10.1007/978-1-4899-7519-5_3
Access Statistics for this chapter
More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().