EconPapers    
Economics at your fingertips  
 

Long-Term Planning Models

Xu Andy Sun and Antonio J. Conejo
Additional contact information
Xu Andy Sun: Massachusetts Institute of Technology
Antonio J. Conejo: The Ohio State University

Chapter Chapter 8 in Robust Optimization in Electric Energy Systems, 2021, pp 303-326 from Springer

Abstract: Abstract This chapter describes four long-term power system planning problems that can be expressed and solved as Adaptive Robust Optimization (ARO) models. These four problems are: 1. Generation expansion planning. 2. Generation and transmission expansion planning. 3. Transmission expansion planning. 4. Long-term hydroelectric scheduling.

Date: 2021
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-3-030-85128-6_8

Ordering information: This item can be ordered from
http://www.springer.com/9783030851286

DOI: 10.1007/978-3-030-85128-6_8

Access Statistics for this chapter

More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:isochp:978-3-030-85128-6_8