EconPapers    
Economics at your fingertips  
 

Integrated Production and Outbound Distribution Scheduling: Online Problems

Zhi-Long Chen and Nicholas G. Hall
Additional contact information
Zhi-Long Chen: University of Maryland
Nicholas G. Hall: Ohio State University

Chapter Chapter 4 in Supply Chain Scheduling, 2022, pp 137-184 from Springer

Abstract: Abstract In this chapter we discuss online integrated production and outbound distribution scheduling (O-IPODS) problems, which are extensions of the offline IPODS problems discussed in Chap. 3 to an online environment. In such problems, jobs arrive over time and the parameters associated with each job are not known until it arrives. Following the classification scheme described in Chap. 3 for offline IPODS problems, O-IPODS problems can also be classified into several different classes in a similar way, and most of them can also be represented by the five-field notation described in Chap. 3 . For each class of O-IPODS problems, we discuss several representative problems, present the corresponding online algorithms for solving these problems, and describe the theoretical performance of these algorithms.

Date: 2022
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-3-030-90374-9_4

Ordering information: This item can be ordered from
http://www.springer.com/9783030903749

DOI: 10.1007/978-3-030-90374-9_4

Access Statistics for this chapter

More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-06-15
Handle: RePEc:spr:isochp:978-3-030-90374-9_4