Scheduling with Flexible Maintenance
Vitaly A. Strusevich () and
Kabir Rustogi
Additional contact information
Vitaly A. Strusevich: University of Greenwich
Kabir Rustogi: University of Greenwich
Chapter Chapter 14 in Scheduling with Time-Changing Effects and Rate-Modifying Activities, 2017, pp 291-315 from Springer
Abstract:
Abstract In most problems considered in Chap. 13 , a single machine is subject to a single compulsory maintenance, and the start time s of the compulsory maintenance period (CMP) and its duration $$\Delta $$ Δ are fixed. In this chapter, we also consider single machine scheduling problems with maintenance activities; however, now, the location of a maintenance period (MP) is less restrictive, and in fact, it is a decision variable so that its value may affect the objective function. Unless stated otherwise, in scheduling problems discussed in this chapter, the jobs of set $$N=\left\{ 1,2,\ldots ,n\right\} $$ N = 1 , 2 , … , n are to be processed on a single machine.
Keywords: Flexible Maintenance; Compulsory Maintenance; Single Machine Scheduling Problem; Maintenance Period (MP); Fully Polynomial Time Approximation Scheme (FPTAS) (search for similar items in EconPapers)
Date: 2017
References: Add references at CitEc
Citations: View citations in EconPapers (1)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-3-319-39574-6_14
Ordering information: This item can be ordered from
http://www.springer.com/9783319395746
DOI: 10.1007/978-3-319-39574-6_14
Access Statistics for this chapter
More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().