Production Planning Problem
Dariush Khezrimotlagh and
Yao Chen
Additional contact information
Dariush Khezrimotlagh: Penn State Univeristy
Yao Chen: University of Massachusetts at Lowell
Chapter Chapter 9 in Decision Making and Performance Evaluation Using Data Envelopment Analysis, 2018, pp 251-288 from Springer
Abstract:
Abstract Production in large firms with a centralized decision-making unit usually involves the contribution of several individual units. Supermarket chains or organizations with several workshops include more than one unit in which each unit contributes to a part of the entire production. For example, a sales plan is decided by a bank’s cooperate management for its divisions regarding the number of credit cards to be issued and the number of loans to be processed. The central division defines a plan to optimize the average or overall production performance in the entire organization after planning. In this chapter, a production-planning problem which is regularly faced by the central decision-making units is illustrated. Two planning ideas, proposed by Du et al. (2010), are discussed to arrange new input and output plans for all specific units when demand deviations can be predicted.
Date: 2018
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-3-319-76345-3_9
Ordering information: This item can be ordered from
http://www.springer.com/9783319763453
DOI: 10.1007/978-3-319-76345-3_9
Access Statistics for this chapter
More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().