Single-Stage Service Level and Tardiness Model
Klaus Altendorfer
Additional contact information
Klaus Altendorfer: University of Applied Sciences Upper Austria
Chapter Chapter 3 in Capacity and Inventory Planning for Make-to-Order Production Systems, 2014, pp 19-42 from Springer
Abstract:
Abstract For production systems, the relationship between utilization, WIP, and production lead time is analytically well defined in the literature. Nonetheless, this relationship lacks a link to the customer’ perspective as shown in Chap. 2. This lack of analytical models to identify the link between the internal production system behavior and the external customer related measures of service level and tardiness for MTO production systems leads to the model developed in this chapter.
Keywords: Lead Time; Service Level; Interarrival Time; Customer Order; Order Release (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:lnechp:978-3-319-00843-1_3
Ordering information: This item can be ordered from
http://www.springer.com/9783319008431
DOI: 10.1007/978-3-319-00843-1_3
Access Statistics for this chapter
More chapters in Lecture Notes in Economics and Mathematical Systems from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().