EconPapers    
Economics at your fingertips  
 

Single-Stage Service Level and Tardiness Model

Klaus Altendorfer
Additional contact information
Klaus Altendorfer: University of Applied Sciences Upper Austria

Chapter Chapter 3 in Capacity and Inventory Planning for Make-to-Order Production Systems, 2014, pp 19-42 from Springer

Abstract: Abstract For production systems, the relationship between utilization, WIP, and production lead time is analytically well defined in the literature. Nonetheless, this relationship lacks a link to the customer’ perspective as shown in Chap. 2. This lack of analytical models to identify the link between the internal production system behavior and the external customer related measures of service level and tardiness for MTO production systems leads to the model developed in this chapter.

Keywords: Lead Time; Service Level; Interarrival Time; Customer Order; Order Release (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:lnechp:978-3-319-00843-1_3

Ordering information: This item can be ordered from
http://www.springer.com/9783319008431

DOI: 10.1007/978-3-319-00843-1_3

Access Statistics for this chapter

More chapters in Lecture Notes in Economics and Mathematical Systems from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:lnechp:978-3-319-00843-1_3