Problem Statements
Philipp Melchiors
Additional contact information
Philipp Melchiors: Technische Universität München
Chapter Chapter 2 in Dynamic and Stochastic Multi-Project Planning, 2015, pp 7-18 from Springer
Abstract:
Abstract In this section, we present general assumptions and introduce basic notation.
Keywords: Schedule Problem; Activity Type; Schedule Policy; Decision Time; Resource Type (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:lnechp:978-3-319-04540-5_2
Ordering information: This item can be ordered from
http://www.springer.com/9783319045405
DOI: 10.1007/978-3-319-04540-5_2
Access Statistics for this chapter
More chapters in Lecture Notes in Economics and Mathematical Systems from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().