Challenge Detailed Planning in ERP
Norbert Obermayr ()
Additional contact information
Norbert Obermayr: Dr. Obermayr GmbH
A chapter in Multidimensional Views on Enterprise Information Systems, 2016, pp 55-68 from Springer
Abstract:
Abstract Each ERP-system plans very carefully, but determinate software plans with inaccurate data. The result is doubtful. This paper shows on why planning results are not very useful and how to manage uncertain data. Many companies use a capacity-planning with time-units in seconds, but the input-data only allows statements in hours. Future ERP-systems have to combine a learning process organisation with a personal leadership organisation to optimize the planning results and to achieve market close.
Keywords: Deterministic planning under uncertainty; Data management; Unsafe to incorrect data; Learning processes (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:lnichp:978-3-319-27043-2_5
Ordering information: This item can be ordered from
http://www.springer.com/9783319270432
DOI: 10.1007/978-3-319-27043-2_5
Access Statistics for this chapter
More chapters in Lecture Notes in Information Systems and Organization from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().