Underlying Causes, Effects and Mitigation Measures of Delays in Construction Projects
Upeksha Madanayake () and
Virginia Toli
Additional contact information
Upeksha Madanayake: University of Reading
Virginia Toli: London South Bank University
Chapter Chapter 130 in Proceedings of the 28th International Symposium on Advancement of Construction Management and Real Estate, 2024, pp 1879-1892 from Springer
Abstract:
Abstract Delays in construction projects are identified as a worldwide issue as it has been addressed in many recent empirical studies. This paper aims to investigate the causes and effects of these delays and analyse whether these delays can be mitigated with a well-managed strategy. This study utilises a qualitative approach by first, conducting a critical review of the literature to analyse the causes and effects of construction delays. The study then conducts in-depth interviews with construction professionals to verify the industry’s position on this topic and to make recommendations about the mitigating measures. The interviewees sample represents a cross-section of the industry and its project roles. The key findings of a total of 12 interviews highlighted that ‘financial related effects’ are the most crucial ones that requires close scrutiny. Among the parties involved in a construction project, ‘client’ is in the highest risk of being penalized for these financial implications of delays. Although the contractor is generally required to try to prevent or mitigate delay, even where the fault is not their own, clients have the highest level of responsibility in delay-related decision making. However, depending on the procurement route this can vary. In terms of the causes ‘communication, coordination and planning’ reports as the highest contributor for to delays. The effects of these are mostly lost profit claims and delay and disruption claims. However, Building information modelling possesses a potential to mitigate the latter and. Nonetheless, the interviewees also highlight the need for training and awareness in above digital technology over traditional management practices, to perceive desired value.
Keywords: Causes of delays; Effects of delays; Mitigation measures; Construction projects; Construction delays (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:lnopch:978-981-97-1949-5_131
Ordering information: This item can be ordered from
http://www.springer.com/9789819719495
DOI: 10.1007/978-981-97-1949-5_131
Access Statistics for this chapter
More chapters in Lecture Notes in Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().