Correction to: A Lean Optimization Simulation Model for Mixed-Flow Production of Prefabricated Components
Long Li,
Yuhang Diao (),
He Zhou and
Ruiyan Zheng
Additional contact information
Long Li: Qingdao University of Technology
Yuhang Diao: Qingdao University of Technology
He Zhou: Chongqing University
Ruiyan Zheng: Dalian University of Technology
Chapter 142 in Proceedings of the 28th International Symposium on Advancement of Construction Management and Real Estate, 2025, pp C1-C1 from Springer
Date: 2025
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:lnopch:978-981-97-1949-5_143
Ordering information: This item can be ordered from
http://www.springer.com/9789819719495
DOI: 10.1007/978-981-97-1949-5_143
Access Statistics for this chapter
More chapters in Lecture Notes in Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().