Multi-Objective Scheduling Optimisation for Super High-Rise Projects Considering the MRCPSP
Huiyi Chen,
Kaixun Dong and
Weiwei Bu ()
Additional contact information
Huiyi Chen: School of Yunnan University
Kaixun Dong: School of Yunnan University
Weiwei Bu: School of Yunnan University
Chapter Chapter 46 in Proceedings of the 28th International Symposium on Advancement of Construction Management and Real Estate, 2024, pp 661-675 from Springer
Abstract:
Abstract Compared with general civil engineering, the horizontal and vertical construction spaces of super high-rise projects intersect more closely within the same time window, which makes the interlocking of resources more likely to cause scheduling confusion. Accordingly, the paper introduces the Multimode Resource Constrained Project Schedule Problem (MRCPSP) model to solve the optimal construction scheduling scheme with the objective of duration-cost-resource balance. In terms of model optimisation, considering the ambiguity of the traditional MRCPSP in defining multi-mode combinations, a definition based on the upper and lower bounds of duration as well as a P-MRCPSP (with Pre-emptive execution) model based on mode optionality for specific processes are proposed. In terms of goal setting, this paper innovatively introduces the resource tension index and realises the resource levelling calculation based on the risk importance of resources. In terms of algorithm optimisation, the NSGA-II algorithm was considered to solve a multi-mode multi-objective model in which the task chain table coding sequence could not satisfy the process logic; the serial scheduling import process was also inefficient, and the elitism strategy high-density solution was easily rejected. The results of the algorithm showed that the minimum duration and cost scheduling solutions were superior to the original solutions, and new patterns were identified for the relationships among the three objective values and for resource scheduling.
Keywords: Super high-rise; Multimode resource constrained project scheduling problem; MRCPSP; NSGA-II (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:lnopch:978-981-97-1949-5_46
Ordering information: This item can be ordered from
http://www.springer.com/9789819719495
DOI: 10.1007/978-981-97-1949-5_46
Access Statistics for this chapter
More chapters in Lecture Notes in Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().