Research on the Allocation of Contracted Power Generation in Electricity Grid Management
Weihan Yuan () and
Lei Wu ()
Additional contact information
Weihan Yuan: University of Science and Technology Beijing
Lei Wu: University of Science and Technology Beijing
A chapter in LISS 2023, 2024, pp 509-519 from Springer
Abstract:
Abstract This paper focuses on the allocation problem of contracted power generation at different time periods on the power plant side, within the context of using a contract-based planning management mode for power generation. Based on the waterfall iteration algorithm, which addresses the allocation of contracted power generation quantity, the study considers the power output characteristics of the grid units and the forecasted grid load. It provides optimization algorithms and suggestions for different patterns of load forecasting curves, aiming to better meet the electricity demand of urban areas.
Keywords: waterfall iteration algorithm; contracted power generation quantity; unit power characteristics; grid load (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:lnopch:978-981-97-4045-1_39
Ordering information: This item can be ordered from
http://www.springer.com/9789819740451
DOI: 10.1007/978-981-97-4045-1_39
Access Statistics for this chapter
More chapters in Lecture Notes in Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().