EconPapers    
Economics at your fingertips  
 

Schedule This - A Decision Support System for Movie Shoot Scheduling

Felix Bomsdorf (), Ulrich Derigs () and Olaf Jenal ()
Additional contact information
Felix Bomsdorf: University of Cologne
Ulrich Derigs: University of Cologne
Olaf Jenal: University of Cologne

A chapter in Operations Research Proceedings 2006, 2007, pp 395-401 from Springer

Abstract: Abstract Creating a movie shoot schedule is an important part of the movie production process. Even for a small movie project already 50 activities requiring 130 resources such as different actors, director, team, special effects and locations etc. have to be scheduled respecting complex constraints which may be imposed on single resources as well as on every activity.

Keywords: Decision Support System; Project Schedule; Precedence Relation; Feasible Schedule; Manual Schedule (search for similar items in EconPapers)
Date: 2007
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:oprchp:978-3-540-69995-8_64

Ordering information: This item can be ordered from
http://www.springer.com/9783540699958

DOI: 10.1007/978-3-540-69995-8_64

Access Statistics for this chapter

More chapters in Operations Research Proceedings from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:oprchp:978-3-540-69995-8_64