Estimating trenching costs in FTTx network planning
Sebastian Orlowski (),
Axel Werner () and
Roland Wessäly ()
Additional contact information
Sebastian Orlowski: atesio GmbH
Axel Werner: Zuse Institute Berlin
Roland Wessäly: atesio GmbH
A chapter in Operations Research Proceedings 2011, 2012, pp 89-94 from Springer
Abstract:
Abstract In this paper we assess to which extent trenching costs of an FTTx network are unavoidable, even if technical side constraints are neglected. For that purpose we present an extended Steiner tree model. Using a variety of realistic problem instances we demonstrate that the total trenching cost can only be reduced by about 5 percent in realistic scenarios. This work has been funded by BMBF (German Federal Ministry of Education and Research) within the program “KMU-innovativ”.
Keywords: Steiner Tree; Setup Cost; Steiner Tree Problem; Solution Network; Joint Closure (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:oprchp:978-3-642-29210-1_15
Ordering information: This item can be ordered from
http://www.springer.com/9783642292101
DOI: 10.1007/978-3-642-29210-1_15
Access Statistics for this chapter
More chapters in Operations Research Proceedings from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().