Experiences from Implementing a Collaborative Project Delivery Method
Atle Engebø (),
Julian Andreas Moen Rygh,
Ole Jonny Klakegg (),
Jardar Lohne () and
Ola Lædre ()
Additional contact information
Atle Engebø: Department of Civil and Environmental Engineering, Norwegian University of Science and Technology (NTNU)
Julian Andreas Moen Rygh: Veidekke
Ole Jonny Klakegg: Department of Civil and Environmental Engineering, Norwegian University of Science and Technology (NTNU)
Jardar Lohne: Department of Civil and Environmental Engineering, Norwegian University of Science and Technology (NTNU)
Ola Lædre: Department of Civil and Environmental Engineering, Norwegian University of Science and Technology (NTNU)
Chapter Chapter 23 in SDGs in Construction Economics and Organization, 2023, pp 327-341 from Springer
Abstract:
Abstract During the last decades, a change has happened in which the project delivery methodsProject delivery methods have been adapted to the increasingly complex projects. Essential elements are the focus on early involvement of key actorsActors, shared decision-making, risk, reward, etc. Although more projects are carried out in this manner, there are still unanswered questions about the effects and the project participants’ experiences. This chapter reports on a case project in Trondheim, Norway. Document studies, eight in-depth interviews, and observation of eight integrated concurrent engineering sessions have been conducted. The contractorContractors was involved early in the project. Thus, the delivery method acquired collaborationCollaborations among the contractorContractors, client, architect, and relevant consultants to find the optimal solutions. The study revealed several lessons for future collaborative projects. First, the client should set a more explicit financial framework, potentially leading to more favourable working conditions and time savings. In addition, elements such as shared goals and objectives should be updated and maintained throughout the project. Finally, cultural elements are less tangible and concrete and therefore seem less attended to in these projects. As a result, relationship building seems to be downgraded in times of uncertainty and time pressure. This underpins the importance of facilitating relationship building and other cultural elements through the project’s delivery method.
Keywords: Project delivery methods; Partnering; Collaboration; Early contractor involvement; Pre-construction phase (search for similar items in EconPapers)
Date: 2023
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:prbchp:978-3-031-25498-7_23
Ordering information: This item can be ordered from
http://www.springer.com/9783031254987
DOI: 10.1007/978-3-031-25498-7_23