EconPapers    
Economics at your fingertips  
 

Methods for the Evaluation and Comparison of Transportation System Projects

Ennio Cascetta ()
Additional contact information
Ennio Cascetta: Università degli Studi di Napoli Federico II

Chapter Chapter 10 in Transportation Systems Analysis, 2009, pp 621-681 from Springer

Abstract: Abstract The decision-making process can address the evaluation of an individual project or the comparison of multiple alternative projects. The first case examines the economic, financial and other impacts of carrying out a particular project. In the second case, the decision-making process is intended to help choose the best among different possible solutions whose economic or financial impacts have been previously determined. This chapter focuses on the activities relating to project evaluation and comparison. Economic and financial analysis techniques used in project evaluation such as Cost-Benefit analysis and Cost-Revenue analysis as well as Multi-Criteria analysis methods for the comparison of alternative projects are described in detail.

Keywords: Generalize Cost; Monetary Unit; Priority Vector; Multicriteria Analysis; Trip Purpose (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:spochp:978-0-387-75857-2_10

Ordering information: This item can be ordered from
http://www.springer.com/9780387758572

DOI: 10.1007/978-0-387-75857-2_10

Access Statistics for this chapter

More chapters in Springer Optimization and Its Applications from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:spochp:978-0-387-75857-2_10