Chance-Constraint-Based Heuristics for Production Planning in the Face of Stochastic Demand and Workload-Dependent Lead Times
Tarik Aouam () and
Reha Uzsoy ()
Additional contact information
Tarik Aouam: Al Akhawayn University
Reha Uzsoy: North Carolina State University
A chapter in Decision Policies for Production Networks, 2012, pp 173-208 from Springer
Abstract:
Abstract While the problem of planning production in the face of uncertain demand has been studied in various forms for decades, there is still no completely satisfactory solution approach. In this chapter we propose several heuristics based on chance-constrained models for a simple single stage single product system with workload-dependent lead times, which we compare to two-stage and multi-stage stochastic programing formulations. Exploratory computational experiments show promising performance for the heuristics, and raise a number of interesting issues that arise in comparing solutions obtained by the different approaches.
Keywords: Lead Time; Planning Horizon; Fill Rate; Scenario Tree; Safety Stock (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations: View citations in EconPapers (1)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-0-85729-644-3_8
Ordering information: This item can be ordered from
http://www.springer.com/9780857296443
DOI: 10.1007/978-0-85729-644-3_8
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().