Conclusions and Future Directions
Hubert Missbauer and
Reha Uzsoy
Additional contact information
Hubert Missbauer: University of Innsbruck
Reha Uzsoy: North Carolina State University
Chapter Chapter 11 in Production Planning with Capacitated Resources and Congestion, 2020, pp 263-279 from Springer
Abstract:
Abstract By the nature of this problem domain, this volume has ranged widely over a great deal of ground, and we hope that the reader has found the journey worthwhile. This chapter concludes the book with a brief review of the principal results and their implications for future work, both related to the clearing functions that are the central concern of this volume and for the broader field of production planning models.
Date: 2020
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-1-0716-0354-3_11
Ordering information: This item can be ordered from
http://www.springer.com/9781071603543
DOI: 10.1007/978-1-0716-0354-3_11
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().