Time-Varying Lead Times and Iterative Multi-Model Approaches
Hubert Missbauer and
Reha Uzsoy
Additional contact information
Hubert Missbauer: University of Innsbruck
Reha Uzsoy: North Carolina State University
Chapter Chapter 6 in Production Planning with Capacitated Resources and Congestion, 2020, pp 113-141 from Springer
Abstract:
Abstract The planning models in the previous chapter assume the planned lead times to be workload-independent, exogenous parameters that remain constant over the entire planning horizon. We now consider models with exogenous lead times that vary over time, seeking to accommodate time-varying levels of resource utilization. Since, as discussed in Chap. 2 , cycle times depend on capacity utilization, which is determined by release decisions, obtaining time-varying estimates of lead time parameters requires observation or prediction of resource utilization across the time periods in the planning horizon. This tight linkage of utilization and cycle time suggests that releases and lead times should be jointly determined, i.e., the lead times should be endogenous to the model.
Date: 2020
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-1-0716-0354-3_6
Ordering information: This item can be ordered from
http://www.springer.com/9781071603543
DOI: 10.1007/978-1-0716-0354-3_6
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().