EconPapers    
Economics at your fingertips  
 

Time-Varying Lead Times and Iterative Multi-Model Approaches

Hubert Missbauer and Reha Uzsoy
Additional contact information
Hubert Missbauer: University of Innsbruck
Reha Uzsoy: North Carolina State University

Chapter Chapter 6 in Production Planning with Capacitated Resources and Congestion, 2020, pp 113-141 from Springer

Abstract: Abstract The planning models in the previous chapter assume the planned lead times to be workload-independent, exogenous parameters that remain constant over the entire planning horizon. We now consider models with exogenous lead times that vary over time, seeking to accommodate time-varying levels of resource utilization. Since, as discussed in Chap. 2 , cycle times depend on capacity utilization, which is determined by release decisions, obtaining time-varying estimates of lead time parameters requires observation or prediction of resource utilization across the time periods in the planning horizon. This tight linkage of utilization and cycle time suggests that releases and lead times should be jointly determined, i.e., the lead times should be endogenous to the model.

Date: 2020
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-1-0716-0354-3_6

Ordering information: This item can be ordered from
http://www.springer.com/9781071603543

DOI: 10.1007/978-1-0716-0354-3_6

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-23
Handle: RePEc:spr:sprchp:978-1-0716-0354-3_6