Manufacturing Models

Michael L. Pinedo ()
Additional contact information
Michael L. Pinedo: Stern School of Business New York University, Department of Information, Operations, and Management Sciences

Chapter Chapter 2 in Planning and Scheduling in Manufacturing and Services, 2009, pp 19-35 from Springer

Abstract: Abstract Manufacturing systems can be characterized by a variety of factors: the number of resources or machines, their characteristics and configuration, the level of automation, the type of material handling system, and so on. The differences in all these characteristics give rise to a large number of different planning and scheduling models. In a manufacturing model, a resource is usually referred to as a “machine”; a task that has to be done on a machine is typically referred to as a “job”. In a production process, a job may be a single operation or a collection of operations that have to be done on various different machines. Before describing the main characteristics of the planning and scheduling problems considered in Part II of this book, we give a brief overview of five classes of manufacturing models. The first class of models are the project planning and scheduling models. Project planning and scheduling is important whenever a large project,that consists of many stages,h as to be carried out. A project,su ch as the construction of an aircraft carrier or a skyscraper,t ypically consists of a number of activities or jobs that may be subject to precedence constraints. A job that is subject to precedence constraints cannot be started until certain other jobs have been completed. In project scheduling,it is often assumed that there are an unlimited number of machines or resources,so that a job can start as soon as all its predecessors have been completed. The objective is to minimize the completion time of the last job,com monly referred to as the makespan. It is also important to find the set of jobs that determines the makespan,as these jobs are critical and cannot be delayed without delaying the completion of the entire project. Project scheduling models are also important in the planning and scheduling of services. Consider,fo r example, the planning and scheduling of a large consulting project.

Keywords: Schedule Problem; Setup Time; Precedence Constraint; Sequence Dependent Setup Time; Material Handling System (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-1-4419-0910-7_2

Ordering information: This item can be ordered from
http://www.springer.com/9781441909107

DOI: 10.1007/978-1-4419-0910-7_2

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2026-07-12
Handle: RePEc:spr:sprchp:978-1-4419-0910-7_2