A Methodology for Assessing Schedule Risk in Software Development Estimates

William M. Stein
Additional contact information
William M. Stein: The MITRE Corporation

Chapter 6 in Cost Analysis and Estimating, 1991, pp 118-142 from Springer

Abstract: Abstract Planning estimates for software development schedules are often obtained using a schedule-estimating equation that expresses the schedule estimate (in calendar months) as a nonlinear function of the total development effort (in staff-months). For example, the COCOMO schedule model [1] for embedded-mode developments is Schedule = 2.5 (Effort)0.32 We address the problem of measuring the error of uncertainty in the schedule estimate when the error of the effort estimate and the error of the schedule model (given actual effort data) are known. We illustrate the methodology for two models calibrated to historical cost data.

Keywords: Software Development; Beta Distribution; Effort Estimate; Triangular Distribution; Nonzero Probability (search for similar items in EconPapers)
Date: 1991
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-1-4612-3202-5_6

Ordering information: This item can be ordered from
http://www.springer.com/9781461232025

DOI: 10.1007/978-1-4612-3202-5_6

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2026-06-25
Handle: RePEc:spr:sprchp:978-1-4612-3202-5_6