EconPapers    
Economics at your fingertips  
 

Combinatorial Scheduling Theory

Ronald L. Graham

A chapter in Mathematics Today Twelve Informal Essays, 1978, pp 183-211 from Springer

Abstract: Abstract Things had not been going at all well in the assembly section of the Acme Bicycle Company. For the past six months, the section had consistently failed to meet its quota and heads were beginning to roll. As newly appointed foreman of the assembly section, you have been brought in to remedy this sad state of affairs. You realize that this is your big chance to catch the eye of upper management, so the first day on the job you roll up your sleeves and begin finding out everything you can about what goes on in the section.

Keywords: Schedule Problem; Optimal Schedule; Precedence Constraint; Finish Time; Optimal Packing (search for similar items in EconPapers)
Date: 1978
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-1-4613-9435-8_8

Ordering information: This item can be ordered from
http://www.springer.com/9781461394358

DOI: 10.1007/978-1-4613-9435-8_8

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2026-07-12
Handle: RePEc:spr:sprchp:978-1-4613-9435-8_8