Infrastructure: Supporting the Project
Alan Cline
Chapter Chapter 6 in Agile Development in the Real World, 2015, pp 105-117 from Springer
Abstract:
Abstract The product is built by a team of differently skilled people, each using their own specific set of tools and procedures, and working in different system environments to accomplish their tasks. They also require a set of tools and procedures used by the team as a whole. The project infrastructure must include environments (hardware plus software tools) for analysis, construction, testing, managing, and sharing information. The staging and production environments must also be considered before the product goes into operation. Frequently, an additional environment must be set up for training the users, the helpdesk, and others.
Keywords: Production Environment; Unit Testing; Open Source Tool; User Story; Business Process Modeling Notation (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-1-4842-1679-8_6
Ordering information: This item can be ordered from
http://www.springer.com/9781484216798
DOI: 10.1007/978-1-4842-1679-8_6
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().