Preparation Phase (Preparations in SAP ECC System Before SUM) – Part 1
Ravi Surya Subrahmanyam
Chapter Chapter 5 in SAP S/4HANA Conversion, 2022, pp 137-218 from Springer
Abstract:
Abstract When converting to SAP S/4HANA, the preparation activities are the key to the success of the project. If the preparation activities are incomplete, SUM verifies this during its run and throws error messages. If the error is severe (such as return code 12), SUM stops running in the first phase. If the severity is low (such as return code 8 or 7), SUM stops or sends a message during its third or fourth phase.
Date: 2022
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-1-4842-8091-1_5
Ordering information: This item can be ordered from
http://www.springer.com/9781484280911
DOI: 10.1007/978-1-4842-8091-1_5
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().