EconPapers    
Economics at your fingertips  
 

Realization Phase (Preparation and Migration of Customizing)

Ravi Surya Subrahmanyam

Chapter Chapter 8 in SAP S/4HANA Conversion, 2022, pp 291-361 from Springer

Abstract: Abstract After the preparation phase, consultants start working with the SUM (Software Update Manager) tool. This tool is used to convert the system to SAP S/4HANA. Consultants might have executed the Maintenance Planner before the SUM. The SUM tool requires the stack.xml file that's generated by the Maintenance Planner as an input.

Date: 2022
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-1-4842-8091-1_8

Ordering information: This item can be ordered from
http://www.springer.com/9781484280911

DOI: 10.1007/978-1-4842-8091-1_8

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-23
Handle: RePEc:spr:sprchp:978-1-4842-8091-1_8