Rework
Ata Allah Taleizadeh
Additional contact information
Ata Allah Taleizadeh: University of Tehran
Chapter Chapter 4 in Imperfect Inventory Systems, 2021, pp 235-365 from Springer
Abstract:
Abstract Scrap and rework costs are a manufacturing reality impacting organizations across all industries and product lines. Scrap and rework costs are caused by many things—when the wrong parts are ordered, when engineering changes are not effectively communicated, or when designs are not properly executed on the manufacturing line. No matter why scrap and rework occurs, its impact on an organization is always the same—wasted time and money. And while no one, especially an operations manager, wants to admit it, these expenses add up quickly and negatively impact the bottom line.
Date: 2021
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-030-56974-7_4
Ordering information: This item can be ordered from
http://www.springer.com/9783030569747
DOI: 10.1007/978-3-030-56974-7_4
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().