Optimization for Project Scheduling
Hêriş Golpîra (),
Sina Safaeipour and
Syed Abdul Rehman Khan
Additional contact information
Hêriş Golpîra: Sanandaj Branch, Islamic Azad University, Department of Industrial Engineering
Sina Safaeipour: Sanandaj Branch, Islamic Azad University, Department of Industrial Engineering
Syed Abdul Rehman Khan: School of Management and Engineering, Xuzhou University of Technology
Chapter Chapter 3 in Application of Mathematics and Optimization in Construction Project Management, 2021, pp 51-78 from Springer
Abstract:
Abstract In this chapter, the literature on mathematical optimization of the construction project scheduling problems is systematically reviewed. Despite the existence of review studies on the project scheduling problem in the research background, so far no research work has been done to examine and further classify the mathematical aspects of the problem modeling and solution approaches. Besides, no research explains the mathematical details of modeling, solution methods, and the development process of the problem. This chapter is organized to cover these research gaps and proposing some potentials for further extension of the concept.
Keywords: Project management; Construction projects; Scheduling; Optimization (search for similar items in EconPapers)
Date: 2021
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-030-81123-5_3
Ordering information: This item can be ordered from
http://www.springer.com/9783030811235
DOI: 10.1007/978-3-030-81123-5_3
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().