Our Age of Restoration
Richard M. Robinson ()
Additional contact information
Richard M. Robinson: State University of New York
Chapter Chapter 13 in Restoring America's Rivers, 2025, pp 403-428 from Springer
Abstract:
Abstract As a completion of the narrative about the 1999 dam removal events in Maine, this concluding chapter reviews the recent developments of that State’s river restorations with respect to its wind and lithium-ion battery constructions for relieving its reliance on hydropower and fossil fuels. This includes the NECEC power source from Hydro-Quebec. It also reviews the motivations for our national dam deconstruction movement: indigenous justice, ecological restoration, safety concerns, and the demands for natural interactions for recreation. Following the procedures of the Federal Energy Regulatory Commission (FERC), the US’ water project evaluation methodology has now evolved toward being a highly structured stakeholder collaborative process, and this evolution is also reviewed.
Keywords: Water project analysis; ASDSO; Low-head dam removals; Indigenous justice; NECEC; Lithium-ion battery storage; Hydro-Quebec (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-031-81758-8_13
Ordering information: This item can be ordered from
http://www.springer.com/9783031817588
DOI: 10.1007/978-3-031-81758-8_13
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().