Implementation
Robert F. Bordley ()
Additional contact information
Robert F. Bordley: University Of Michigan, Systems Engineering and Design Program, Industrial and Operations Engineering Department, College of Engineering
Chapter Chapter 12 in Managing Project Complexity and Risk with Systems Engineering, 2026, pp 143-150 from Springer
Abstract:
Abstract Once a product is validated and ready for use, the focus shifts to producing the number of units of the product needed, shipping each product to the place of use and installing the product to it can be used by the customer. These lead to different kinds of challenges in different industries.
Date: 2026
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-032-08901-4_12
Ordering information: This item can be ordered from
http://www.springer.com/9783032089014
DOI: 10.1007/978-3-032-08901-4_12
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().