EconPapers    
Economics at your fingertips  
 

Deterministic Models: Preliminaries

Michael L. Pinedo
Additional contact information
Michael L. Pinedo: NYU Stern School of Business, IOMS Dept Rm 8-59 KMC

Chapter Chapter 2 in Scheduling, 2016, pp 13-32 from Springer

Abstract: Abstract Over the last fifty years a considerable amount of research effort has been focused on deterministic scheduling. The number and variety of models considered is astounding. During this time a notation has evolved that succinctly captures the structure of many (but for sure not all) deterministic models that have been considered in the literature.

Keywords: Schedule Problem; Flow Shop; Sequence Dependent Setup Time; Total Weighted Tardiness; Total Weighted Completion Time (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-319-26580-3_2

Ordering information: This item can be ordered from
http://www.springer.com/9783319265803

DOI: 10.1007/978-3-319-26580-3_2

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2026-05-12
Handle: RePEc:spr:sprchp:978-3-319-26580-3_2