Planning order releases for an assembly system with random operation times
Sven Axsäter ()
Additional contact information
Sven Axsäter: Lund University
A chapter in Stochastic Modeling of Manufacturing Systems, 2006, pp 333-344 from Springer
Abstract:
Abstract A multi-stage assembly network is considered. A number of end items should be delivered at a certain time. Otherwise a delay cost is incurred. End items and components that are delivered before they are needed will cause holding costs. All operation times are independent stochastic variables. The objective is to choose starting times for different operations in order to minimize the total expected costs. We suggest an approximate decomposition technique that is based on repeated application of the solution of a simpler single-stage problem. The performance of our approximate technique is compared to exact results in a numerical study.
Keywords: Multi-stage production/inventory systems; Decomposition (search for similar items in EconPapers)
Date: 2006
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-540-29057-5_14
Ordering information: This item can be ordered from
http://www.springer.com/9783540290575
DOI: 10.1007/3-540-29057-5_14
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().