Scheduling of Synthetic Granulate
Marco Richter and
Volker Stockrahm
Additional contact information
Marco Richter: axentiv AG
Volker Stockrahm: axentiv AG
Chapter 25 in Supply Chain Management and Advanced Planning, 2008, pp 463-479 from Springer
Abstract:
Abstract This case study deals with a project which has been finished in its first version in the process industry in 2000 with a quite early release of APO PP/DS and which has been further improved by new releases of SAP APO with their additional functions and the integration of more parts of the supply chain. It was the first APO PP/DS project that managed to keep up with the difficult scheduling requirements in the field of the chemical and process industries.
Keywords: Setup Time; Production Schedule; Production Order; Sequence Dependent Setup Time; Secondary Resource (search for similar items in EconPapers)
Date: 2008
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-540-74512-9_26
Ordering information: This item can be ordered from
http://www.springer.com/9783540745129
DOI: 10.1007/978-3-540-74512-9_26
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().