Implications on Supply Contracts and Partner Incentives
Gregor Dudek ()
Chapter 6 in Collaborative Planning in Supply Chains, 2009, pp 131-164 from Springer
Abstract:
Chapters 4 and 5 describe the negotiation-based scheme for collaborative planning. Thereby the emphasis is laid on conceptual and algorithmic aspects. However, as collaborative planning affects the cost outcomes of involved SC partners, issues relating to the financial flow between the partners need to be considered as well. In particular, the objective is to adapt payments between the parties in such a way that all partners benefit from collaborative planning and hence have an incentive to cooperate with their SC partners. This is dealt with in the following section.
Keywords: Cost Increase; Order Quantity; Perfect Information; Opportunistic Behavior; Negotiation Scheme (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-540-92176-9_6
Ordering information: This item can be ordered from
http://www.springer.com/9783540921769
DOI: 10.1007/978-3-540-92176-9_6
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().