Introduction to Terminology
Erwin Wasielewski
Chapter Chapter 4 in Project Knowledge Management, 2010, pp 33-34 from Springer
Abstract:
Abstract In previous chapters, we have already introduced several terms. In preparation of chapters to come, we want to compile these and some more terms. We have listed them in mathematical notation for explanations, and in a sometimes different, simpler notation for use in files and spreadsheet programs that will be called the “DP” (data processing) notation and will be used in several of the evaluations shown, for instance. Of course, you might want to customize both notations.
Date: 2010
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-540-92794-5_4
Ordering information: This item can be ordered from
http://www.springer.com/9783540927945
DOI: 10.1007/978-3-540-92794-5_4
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().